More
Hot products
Industry information
1.Strictly abide by various operating procedures to ensure safe production.
2.According to the specified pitch requirements of the process,install the corresponding pulley and pitch gear according to the pitch table.
3.Install the cable reel and pull the copper wire through the storage line of the cable rack to the inlet end of the host,and then pass it through the conduit into the host.One of them must be guided through the meter(otherwise,the meter will not count when turned on).
4.Install the take-up reel,thread the wires into the host,pass through various conductors and winches,and finally wrap a few circles around the take-up reel.
5.Close the main power switch inside the host electrical cabinet,and set the length budget of the meter according to the process requirements.If the original length of the meter is not zero,it should be reset to zero.
6.Turn all six toggle switches on the side of the main control cabinet to the ON position.
7.Check if the tray at the bottom of the host has been lowered to the bottom.If it has not been lowered to the bottom,release(rotate counterclockwise)the switch of the oil pressure pump to lower it to the bottom,close the door and cover.
8.Turn the"speed setting potentiometer"on the main electrical cabinet all the way counterclockwise,press the"motor start"button,and then slowly turn the"speed setting"potentiometer clockwise to start the machine running.The running speed is indicated by the tachometer.
9.After reaching the predetermined length,the machine will automatically stop.After the winch is completely stopped,the hood can be opened and the wire unloading door can be lowered.Close the oil pump switch again(rotate clockwise),pull out the oil pump hook,lift the oil pump handle,raise the tray,and press against the take-up reel.After unloading the spool,to avoid the oil pressure handle falling off,the hook should be hooked onto the oil pump handle.
10.During operation,if a broken wire is found,the machine will automatically shut down in an emergency.If an unexpected situation occurs and an emergency stop is required,the machine can be quickly stopped by pressing the"Emergency Stop"button.
11.When a wire is broken or replaced,the joint should be small and reliable.Before the connector reaches the take-up reel,it should run at low speed.At this point,the jog mode should be used for operation.The jog operation method is as follows:open the door cover,hold the microswitch with your left hand,and press the"inch button"with your right hand.The winch will run at low speed.Release this button to stop running.During the inch movement process,the joint should be visually inspected.Once the joint reaches the take-up reel,the door cover can be closed and normal operation can resume.
12.After work is completed,the power should be cut off,waste should be cleaned up,and the machine should be kept clean.
2.According to the specified pitch requirements of the process,install the corresponding pulley and pitch gear according to the pitch table.
3.Install the cable reel and pull the copper wire through the storage line of the cable rack to the inlet end of the host,and then pass it through the conduit into the host.One of them must be guided through the meter(otherwise,the meter will not count when turned on).
4.Install the take-up reel,thread the wires into the host,pass through various conductors and winches,and finally wrap a few circles around the take-up reel.
5.Close the main power switch inside the host electrical cabinet,and set the length budget of the meter according to the process requirements.If the original length of the meter is not zero,it should be reset to zero.
6.Turn all six toggle switches on the side of the main control cabinet to the ON position.
7.Check if the tray at the bottom of the host has been lowered to the bottom.If it has not been lowered to the bottom,release(rotate counterclockwise)the switch of the oil pressure pump to lower it to the bottom,close the door and cover.
8.Turn the"speed setting potentiometer"on the main electrical cabinet all the way counterclockwise,press the"motor start"button,and then slowly turn the"speed setting"potentiometer clockwise to start the machine running.The running speed is indicated by the tachometer.
9.After reaching the predetermined length,the machine will automatically stop.After the winch is completely stopped,the hood can be opened and the wire unloading door can be lowered.Close the oil pump switch again(rotate clockwise),pull out the oil pump hook,lift the oil pump handle,raise the tray,and press against the take-up reel.After unloading the spool,to avoid the oil pressure handle falling off,the hook should be hooked onto the oil pump handle.
10.During operation,if a broken wire is found,the machine will automatically shut down in an emergency.If an unexpected situation occurs and an emergency stop is required,the machine can be quickly stopped by pressing the"Emergency Stop"button.
11.When a wire is broken or replaced,the joint should be small and reliable.Before the connector reaches the take-up reel,it should run at low speed.At this point,the jog mode should be used for operation.The jog operation method is as follows:open the door cover,hold the microswitch with your left hand,and press the"inch button"with your right hand.The winch will run at low speed.Release this button to stop running.During the inch movement process,the joint should be visually inspected.Once the joint reaches the take-up reel,the door cover can be closed and normal operation can resume.
12.After work is completed,the power should be cut off,waste should be cleaned up,and the machine should be kept clean.